Commercial Projects - FCR Electrical & Mechanical Ltd - Commercial Electrical Contractors - Page 2
05 Jul 2022

WELCOME TO 5 CAMDEN PLACE, WINKLEY SQUARE PRESTON, A FULL COMMERCIAL ELECTRICAL REWIRE.

WELCOME TO 5 CAMDEN PLACE, WINKLEY SQUARE PRESTON, A FULL COMMERCIAL ELECTRICAL REWIRE.

5 Camden is the second commercial rewire we have carried out for Money Penny properties LTD. Our first project was a five-apartment commercial conversion on Ribblesdale. This project was double the floor space of Ribblesdale comprising of seven apartments, tow two bedroomed apartments, one penthouse style apartments, two one bedroomed apartments and two studio apartments.

First off for this installation, the 3-phase supply to the property required upgrading by Electricity Northwest, once this was complete it allowed us to install a new 3 phase distribution board located in the cellar. From this distribution board we installed the following

  • A new fire alarm throughout the building
  • Emergency lighting system throughout the landlords’ areas
  • New supplies to each apartment
  • Landlords power
  • Office power and lighting in the basement
  • Outside lighting

Each apartment has a down lights, led lighting, USB charger’s new consumer units, kitchen appliances, local smoke, and heat detection.

This property has now been fully tested, certified and a five yearly EICR issued, the property is now ready to accept their first guests.

If you are considering a commercial conversion and the property needs a full rewire then get in touch using the form below for a free consultation

    Your Name

    Your Address

    Your Email address

    Your Phone Number

    Your Best Date of Appointment *

    Your Best Time of Appointment *

    I am interested in:

    Additional Message

    09 Apr 2022

    MELLING PERFORMANCE SPRINGS, A LITTLE BIT OF THIS AND A LITTLE BIT OF THAT

    This week Andy and Tom have been carrying out various electrical remedial works at Melling performance springs in Lytham St Annes. The work carried out was varied and mostly consisted of the following

    • Replacement of Fluorescent light fittings with LED light fittings in the offices
    • Installation of data points in the offices
    • Installation of galvanized cable trunking
    • Installation of a three-phase supply
    • Re lamping high-level lighting in the workshop areas
    • Upgrading the main supply tails on the in coming supplies to 240mm main tails

    All of the work was carried out successfully and within the allotted time frame allocated including working with Electricity Northwest who came to site to isolate the incoming supplies whilst the main tails were replaced.

    A big thank you to Melling Performance springs for contracting FCR electrical & Mechanical to carry the works out

    01 Apr 2022

    5 CAMDEN PLACE WINKLEY SQUARE

    This week, Jordan and Tom have been back to our 7 apartment development on Winkley Square in Preston.This project has been going on for what feels like a life time, we originally rewired this building and had the first fix of all apartments complete by March 2020, then the lurgy 🤮🤮appeared, this had a major impact on the build schedule.

    Fast forward to March 2022 and our FCR onsite team have five of the seven apartments second fixed, on this project we have completed the following

    🟥 Installation of new three phase supply

    🟥 Rewire of the whole building into seven apartments

    🟥 Full fire alarm system

    🟥 Emergency lighting install through out

    🟥 A M.I.S.T fire suppression system. We will be testing the installation and issuing certificates including the Part P building regulations sign off the first week of April 😃🌍www.fcrelectrical.co.uk☎️ 01253 364029#rewire#apartments#preston#electricalcontractor#renovation#winkleysquare.

    06 Aug 2020

    Sika Plastics, Preston – New Training Facility Building

    Project Description: Install a new Schneider three phase distribution board in the new training facility building including the following installations :

    • Install 4 inch cable tray from mains switch room out to the new training facility
    • Install Sikla cable system over the drive way between the main building and the wall opposite for cable support
    • Install 35mm 5 core armoured cable along tray route using metal tie wraps to secure
    • Install 1 x new general lighting circuit including 6 x LED 5ft battern light fitting manufactured by Ansell c/w 5 year warranty
    • Install emergency lighting as required to include test key switch
    • Install 1 x 32 amp three phase circuit complete with 32A red commando socket, position to be confirmed on site
    • Install 3 x 16 single phase circuit complete with blue commando sockets for roller shutter doors
    • Install power to the roller shutter doors
    • Carry out full test and issue certificates and OEM manual
    06 Aug 2020

    Landlords EICR inspections for Christie King Estates, Blackpool

    FCR Electrical Contractors have started working with Christie King Estates located on Highfield Road, Blackpool to help deliver landlords EICR inspections and remedial repairs to their clients properties to help with current legislation.

    Current legislation in England and Wales states the following, link to this legislation is here https://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-rented-sector-guidance-for-landlords-tenants-and-local-authorities/guide-for-landlords-electrical-safety-standards-in-the-private-rented-sector

    • Ensure national standards for electrical safety are met. These are set out in the 18th edition of the ‘Wiring Regulations’, which are published as British Standard 7671.
    • Ensure the electrical installations in their rented properties are inspected and tested by a qualified and competent person at least every 5 years.
    • Obtain a report from the person conducting the inspection and test which gives the results and sets a date for the next inspection and test.
    • Supply a copy of this report to the existing tenant within 28 days of the inspection and test.
    • Supply a copy of this report to a new tenant before they occupy the premises.
    • Supply a copy of this report to any prospective tenant within 28 days of receiving a request for the report.
    • Supply the local authority with a copy of this report within 7 days of receiving a request for a copy.
    • Retain a copy of the report to give to the inspector and tester who will undertake the next inspection and test.
    • Where the report shows that remedial or further investigative work is necessary, complete this work within 28 days or any shorter period if specified as necessary in the report.
    • Supply written confirmation of the completion of the remedial works from the electrician to the tenant and the local authority within 28 days of completion of the works.

    In executing this contract FCR Electrical are delivering Christie King estates an effective, reliable and compliant electrical service helping them deliver on the current above legislation. If you are a letting agent looking for a quality, reliable and compliant landlords electrical service then please feel free to email [email protected] for further details on how we can help.

    “Residual-current device (RCD), circuit breakers and detectors on house blueprint.”
    06 Jul 2019

    Landlord Rewire & Inspection: 204 Promenade, Blackpool

    This project initially started with a full electrical inspection to the landlord areas. It quickly became evident that the wiring was the original install from the early 1950’s. Fylde Coast rewires were contracted to provide the full rewiring to all of the landlord areas including two basement carparks, nine floors, one electrical mains room and a plant room located up on the tenth floor. We were able to carry out this project with zero loss of the existing electricity supplies to the residents which was a major factor as there are a number of elderly residents.