This week our commercial electricians Jordan and Louie were back at Sika plastics training facility to install extra sockets in the workshop area.

Sika launched in the UK roofing business 60 years ago, Sika are the market leaders in cold-applied liquid waterproofing technology for roofs, walkways, balconies and terraces. For more information click here https://gbr.sika.com/en/construction/roofing/about-us/history.html

We originally installed the electrical installation to this training building in August 2020 which was during covid. To read more about this project click here https://www.fcrelectrical.co.uk/sika-plastics-preston-new-training-facility-building/

Our clients required some metal clad double sockets installing around the perimeter of the building with the cables contained within galv conduit. The sockets were to be wired in four 32 amp RCD protected radial circuits.

When we originally installed the Schneider distribution board we ensured there was plenty of spare ways for future electrical installations as the training facility evolved.

All of the electrical installations have been issued with an electrical installation certificate

    Your Name

    Your Address

    Your Email address

    Your Phone Number

    Your Best Date of Appointment *

    Your Best Time of Appointment *

    I am interested in:

    Additional Message